beautypg.com

4 maintenance – AMETEK SLM Series Rev B User Manual

Page 26

background image

Installation

SLM-Series AC/DC Load

2-4

M540072-01 Rev B

2.3.2

Voltage Sensing Input (Vsense) BNC Connector.

To solve the conductor voltage drop under a big load current, Vsense-CLIP cable
can be used to connect with the specific point to be measured thus obtaining the
specific voltage value. See Figure 2-2 and Figure 2-3.

Figure 2-2 Connection Method for Small Load Current Condition

Figure 2-3 Typical Connection for SLM-Series AC/DC Electronic Load

2.3.3

RS-232C and GPIB Connections

For these connections, refer to the SL-series mainframe operation manual(s).
RS-232 and GPIB programming operation are addressed in Section 4 of this manual.

2.4 MAINTENANCE

WARNING: Avoid electrical shock or damage to the meter.
To avoid electrical shock or damage to the meter, do not get water inside
the case.

Periodically wipe the case with a damp cloth and detergent; do not use abrasives or
solvents.