beautypg.com

Operation – AMETEK SLH Series RevB User Manual

Page 27

background image

M540073-01 Rev C

3-1

SECTION 3

OPERATION

3.1 FRONT PANEL CONTROLS AND INDICATORS

This section describes the front panel and its manual operation of the SLH-series High
Power AC/DC Electronic Load. For calibration procedures, please refer to the SLH-
series High Power Load Calibration Manual. For GPIB control, please refer to Section
4, GPIB Remote Operation, of this manual.

Figure 3-1 Front Panel of SLH-series High Power AC/DC Electronic Load