AMETEK SLH Series RevB User Manual
Page 22
Installation and Maintenance
SLH-Series AC High Power Electronic Load
2-2
M540073-01 Rev C
3. Mark the correct voltage on the rear panel of SLH-series High Power AC/DC
Electronic Load.
4. Check the rating of the line fuse and replace it with the correct fuse if
necessary.
5. The line fuse is located below the AC line receptacle see Fig 2-2. With the
power cord removed, use a small screwdriver to extract the fuse holder from
under the AC socket. Replace the fuse with the appropriate type as indicated in
Table 1-1. These fuses are slow-blow fuses.
6. Reinstall fuse holder and connect the power cord.
Figure 2-2 Fuse Holder in AC Line Input Connector
2.1.2 Grounding
Requirements
The SLH-series High Power AC/DC Electronic Load is equipped with a three-
conductor cable which plugs in an appropriate receptacle to ground the instrument's
cover.
2.1.3 Environmental Requirements
• For indoor use only
• Installation Category II (over voltage)
• Pollution Degree 2
• Altitude up to 2000 meters (with power derating)
• Relative Humidity 80% RH Max
• Ambient Operating Temperature 0-40°C, with ideal being 25°C ± 5°C
2.1.4 Rack
Mount
The SLH-series High Power AC/DC Electronic Load is designed to permit mounting
in a standard 19 inches rack for system application.