beautypg.com

AMETEK RS Series User Manual

Page 176

background image

User Manual

AMETEK Programmable Power

RS Series

176


T1





0 Volt

F1

F2



T2

T3




Test no.

21(I)

22(II)

23(III)

24(IV)

25(V)

26(VI)

T1 (ms)

50

50

100

100

200

200

F1 (Hz)

360

Fmax

360

Fmax

360

Fmax

F2 (Hz)

Fmax

360

Fmax

360

Fmax

360


Fmax = 650 Hz for Group 2
Fmax = 800 Hz for Group 3
T2 = 20 msec
T3 = 5 msec

Figure 9-7: Power Interrupt for Group 2 and 3

VOLTAGE SURGE

This test requires 160 volt output voltage. If the power source is set at the low voltage range,
the high voltage range will be selected before the test starts. At the end of the test, the power
source will be switched back to the low range automatically

Voltage

Time

Seq. No.

RTCA

Group 1

Group 2

Group 3

ALL

1

115

115

115

115

5 Minute

2

160

160

160

170

30msec

3

115

115

115

115

5 Sec.

4

60

70

70

70

30msec

5

115

115

115

115

5 Sec.

Table 9-4: Normal VoltageSurge Sequence

The output voltage will follow the sequence in Table 9-4. The above sequence will repeat itself
three times. Each repeat will start from sequence two. US and Group 1 will run at 400 Hz.
Group 2 and Group 3 will run at 360 Hz and 650 Hz for Group 2 and 800 Hz for Group 3. The
frequency will return to the nominal setting when the test is completed. The

key (backspace)

will terminate the test at any time.