beautypg.com

AMETEK RS Series User Manual

Page 163

background image

User Manual

AMETEK Programmable Power

RS Series

163

Power up the AC source using its on/off switch. A message will appear on the LCD once the
power comes on:

Please wait…

After about 30 seconds, this message changes to:

Loading Program…

When this “Loading Program…” message appears on the LCD of the RS front panel, press the
ENTER key on the keypad of the RS unit once
. If you wait too long, you may have missed the
window and you will have to recycle power on the AC source and try again.

This will put the source controller into the Flash down load mode. Wait until the screen shown
below appears. This screen shows the RS232 setup parameters that are used in the boot loader
mode.

Firmware Down Load Mode

User Entry

Serial Port Setup

Baud 38400,Bits 8,Stop 1,No Parity

Now launch the Flash Loader utility program “FlashLoaderComm.exe”.

Select the COM port to be used (default is COM1). Leave “Baud rate” and “Cmd Delay” set to
their default values of 38400 baud and 0 msec.