Paxton Superchargers Ford Mustang GT User Manual
Page 48
P/N: 4809654 v5.0
©2010 Paxton Automotive
All Rights Reserved, Intl. Copr. Secured
28
8C. CoMPRESSoR ByPASS vALvE #1
ASSEMBLy iNSTALLATioN: (2005-2006
H.o. kits only)
1. Cut a piece of the provided 1" heater hose
approximately 3" long and secure it to the by-
pass valve inlet (opposite the vacuum port)
using the #16 hose clamps provided.
2. Locate the 1" molded rubber 90° elbow and cut
approximately 6" from the long end and 1"
from the short end. Attach the long end to the
by-pass valve discharge and secure using the
#16 hose clamps provided. (See Fig. 8C-a,
8D-c.)
3. Attach the open end of the 3" long hose to the
by-pass port on tube “A” and secure using a
#16 hose clamp. The open end of the 90° hose
will be connected to the inlet duct in a later
step. (See Fig. 8D-c.)
Fig. 8C-a
(TRIM TO APPROX. 5.75")
TO INLET DUCT
BYPASS VALVE
(TRIM TO
APPROX 4”)
3” x 01” HOSE (TRIM TO FIT)
TO DISCHARGE TUBE “A”
7U133-100 MOLDED 90 DEGREE-
HOSE TRIM TO FIT