Installation, General installation guidelines, Dimensions – Pilz PSSu H CAN User Manual
Page 21: 5installation, 1 general installation guidelines, 1 dimensions
![background image](https://www.manualsdir.com/files/762711/content/doc021.png)
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
5-1
5.1
General installation guidelines
5
Installation
5
5000
Installation
Installation
5-
5.1
General installation guidelines
5100
General installation guidelines
5-
][Montage BA Kopfmodul Allgemein
Please also refer to the PSSuniversal Installation Manual.
The description below assumes that the mounting rail is already in-
stalled.
Montage_EMV ESD
5.1.1
Dimensions
Dimensions
5-
][Abmessungen SB p und ST-Bus
CAUTION!
Damage due to electrostatic discharge!
Electrostatic discharge can damage components. Ensure
against discharge before touching the product, e.g. by touching
an earthed, conductive surface or by wearing an earthed arm-
band.
56,4 mm
125,6 mm
72,6 mm
75,2 mm
69,2 mm
2,8 mm
21,6 mm
(2.448")
(2.22")
(0.1
1")
(4.945")
(2.858")
(0.85")
(2.96")