Connecting the base unit and expansion modules, 5installation, 2 connecting the base unit and expansion modules – Pilz PNOZ mmc6p CAN User Manual
Page 18
![background image](https://www.manualsdir.com/files/762622/content/doc018.png)
5.2
Connecting the base unit and expansion modules
5
Installation
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
5-2
5.2
Connecting the base unit and expansion modules
5200
Connecting the base unit and expansion modules
5-
Montage_multi_Anzahl_Module_links_1
You can install a maximum of 1 PNOZ mmc6p to the left of the base
unit.
Montage_multi_Modul_verbind_links_mini_BA
Connect the base unit and the expansion module as described in the
operating instructions for the base units.
Connect the black/yellow terminator to the expansion module
Install the expansion module in the position in which it is configured
in the PNOZmulti Configurator.
This manual is related to the following products: