Martin Christ Alpha 1-2 LDplus User Manual
Page 70

Freeze-dryer Alpha 1-2 LDplus
11 Appendix
70
Version 11/2006, Rev. 2.0 of 02/12/2014 • sb
Translation of the original operating manual
50°C to -54°C. The pressure decreases as a function of the ice
condenser temperature.
NOTE
The drying time depends on the layer thickness of the sample, the solids
content of the sample, and the amount of heat that is supplied during the
drying process. In the case of a layer thickness of 1 cm, the freeze-drying
process usually takes 24 hours.
9 Switch the vacuum pump off and aerate the drying chamber via the
media drain valve or via a rubber valve.
10 Switch the unit off by actuating the mains power switch and take the
product out of the freeze-dryer.
11 Switch the unit on again and start the defrosting process.
CAUTION
Ensure that no water gets into the pipe connection of the vacuum pump or
vacuum sensor.
12 Drain the defrosting water via the defrosting water valve on the left-hand
side of the unit. To do so, connect a hose to the hose connector and
collect the defrosting water in a suitable vessel.
13 Keep the freeze-dryer open (i.e. without the lid or drying chamber) when
it is not in use so that moisture can evaporate. This increases the
service life of the vacuum sensor.
Pos: 212 /01 0 Univ ersal mod ule/Seit enwec hsel @ 0\m od_ 120 211 624 4312 _0. docx @ 10 5 @ @ 1