Physical installation top-mounting – Display Devices Lifts up up 35 lbs User Manual
Page 7

IP025-001 V3
IBL Lift Series Installation
07/05
Thor/Sales Info/Installation Materials/IBL Lift
7
PHYSICAL INSTALLATION
TOP-MOUNTING
Top mounting is typically used when installing the lift into a false ceiling (grid tile) or an
exposed unfinished ceiling.
We recommend you install mounting hardware into a structural channel.
Example – Top Mounting
Structural channel provides flexibility for adjusting the lift front-to-rear and side-to-side.
• All hardware should be at least in 3/8” (M10) diameter.
• You should use angled stabilizers if threaded rods extend 2’ (60 cm) or more
between structural channel and the lift.
• You should also leave the threaded rods slightly loose to ease in alignment and
leveling after installing the lift.
• You need to make sure all hardware is securely tightened at the end of your
installation.