Sears 831.15934 User Manual
Page 7
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

10. Wrap the Weight Coble (52) around o
2"
Pulle./ (4).
Attach the Pulley to the Right Arm (16) with o 3/8' x
1 3/4' Bolt (40) ond 3/8' Nylock Nut (6).
Loy the Weight Coble (52) over a 3 1/2' Pulley (5).
Attach a Coble Trop (67) and the Pulley to the side
of the Upright (9) with o 3/8' x 1 3/4' Bolt (40)
and 3/0' Nylock Nut (6). ‘ ^ake sure that the Coble
Trap is in the '12 o'clock' position.
11. Wrap the Weight Cable (52) under a 2 3/4' Pulley
(13). Attoch the Pulley to the bracket on the side of
the Moment Arm (74) with a 3/8' x 1 3/4' Bolt
(40) and 3/8' Nylock Nut (6).
Attach the end of the Weight Cable (52) to the right
side of the Leg Developer (23) with a 3/8' x 2' Bolt
(45) and 3/8' Nylock Nut (6). Do not overtighten
the Nylock Nut/ the Coble must be oble to swivel
freely or ¡t will be damaged.
12. Insert the threoded bolt on the end of the Weight
Cable (52) into the Adjustment Bracket (53). Thread
the 5/16' Nut (82) exoctly two complete turns onto
the threoded bolt.
13. Wet the upper ends of the Left ond Right Arms (15,
16) and the insides of the two Large Pods (17) with
soapy water. Slide the Large Fads onto the Arms.
Attach the Backrest (19) to the Upright (9) with two
1/4'x2 1/2' Bolts (46).