beautypg.com

Mechanical (cont'd), 1 fuel tank and supply lines (cont'd), 3 loop system – Reznor OH Unit Installation Manual User Manual

Page 8

background image

Form I-OH, PN 120390 R5, Page 8

6. Mechanical

(cont'd)

6.1 Fuel Tank and Supply Lines (cont'd)

FIGURE 5 - Two-Pipe Supply

System (standard 1-stage or

optional 2-stage burner pump)

Fuel Unit

Auxiliary

Filter

Inlet

Lift

3-4”

(76-102mm)

Return

Line

Air

Vent

Fill

Pipe

Oil

Tank

Maximum horizontal supply

line length in TABLE 5

Return

Line

Maximum Horizontal Supply Line Length for

Two-Line System (Supply and Return)

Lift

Std 1-stg pump

Opt 2-stg pump

ft (M)

3/8" OD 1/2" OD 3/8" OD

1/2" OD

0 (0)

84 (25.6) 100 (30.5) 93 (28.3) 100 (30.5)

1 (.3)

77 (23.5) 99 (30.1) 88 (26.8)

99 (30.1)

2 (.6)

71 (21.6) 98 (29.8) 83 (25.3)

98 (29.8)

3 (.9)

65 (19.8) 97 (29.5) 78 (23.8)

97 (29.5)

4 (1.2)

59 (18)

96 (29.3) 73 (22.2)

96 (29.3)

5 (1.5) 52 (15.8)

95 (29)

68 (20.7)

95 (29)

6 (1.8)

46 (14)

94 (28.6) 63 (19.2)

94 (28.6)

7 (2.1) 40 (12.2) 93 (28.3) 58 (17.7)

93 (28.3)

8 (2.4) 34 (10.3)

92 (28)

52 (16)

92 (28)

9 (2.7)

27 (8.2)

91 (27.7) 47 (14.3)

91 (27.7)

10 (3)

21 (6)

90 (27.4) 42 (12.8)

90 (27.4)

11 (3.3)

15 (4.5)

89 (27.1) 37 (11.3)

89 (27.1)

12 (3.6)

9 (2.7)

71 (21.6)

32 (9.8)

88 (26.8)

13 (3.9)

49 (14.9)

27 (8.2)

87 (26.5)

14 (4.2)

27 (8.2)

22 (6.7)

86 (26.2)

16 (4.8)

11 (3.4)

84 (25.6)

18 (5.4)

58 (17.7)

6.1.3 Loop System

The loop piping system uses the standard single-stage burner pump and an optional

boost pump (Option DA1 or DA2; see Paragraph 6.1.5.). A loop system is one in which

a boost pump supplies fuel oil from the supply tank to individual heaters in excess of

burner requirements. The fuel oil is returned to the supply tank. This system should

not be operated at line pressures greater than 3 psi at the first burner supplied. Boost

pump operates full time during the heating season.
NOTE: If a two-foot rise cannot be maintained, use Pressurized System, Paragraph

6.1.4.

FIGURE 6 - Loop

Supply System

for Multiple Unit

Installation
Boost pump must

run continuously.

See Paragraph 6.1.5.

Vent

Manifold

Line

2 ft

(.6M)

min

Feeder Lines

Maximum intake

gauge pressure

at first burner

is 3 PSI.

1/2”

Pipe

Vent

(Outdoors)

Filler

Boost

Pump

Inlet - 1/2” OD

Tubing

35 ft (10.7M)

Maximum

Auxiliary Filter

1/2” OD Tubing

Shutoff Valve

Return 1/2” OD Tubing

15 ft (4.5M)

Maximum

Lift

Tank

Suspended Furnaces

TABLE 6 - Maximum Horizontal

Supply Line Length with Two-Pipe

Supply System (ft/M) - All OH Sizes

6.1.2 Two-Pipe Supply System with Standard Single-Stage Pump

or Optional Two-Stage Pump (cont'd)