MAINTENANCE

7-5

7.9 PLACING THE BOILER BACK IN
SERVICE AFTER A PROLONGED
SHUTDOWN

UNIT
FRAME

EXHAUST

MANIFOLD

CONDENSATE

TRAP

DRAIN

HOSE

CLAMP

1" I.D.

HOSE

TO FLOOR

DRAIN

BOLTS

(4)

FLUE

After a prolonged shutdown (one year or more),
the following procedures must be followed:

1. Review installation requirements included in

Chapter 2.

2. Inspect all piping and connections to the

unit.

3. Inspect exhaust vent, air duct (if applicable).

4. Perform initial startup per Chapter 4.

5. Perform safety device testing and the

scheduled maintenance procedures per
Chapters 6 and 7 of this manual.

Figure 7-5

Exhaust Manifold Condensate Trap &

Drain

7.8 SHUTTING THE BOILER DOWN FOR
AN EXTENDED PERIOD OF TIME

If the boiler is to be taken out of service for an
extended period of time (one year or more), the
following instructions must be followed.

1. Set

ON/OFF switch on the front panel to the

OFF position to shut down the boiler’s
operating controls.

2. Disconnect AC power from the unit.

3. Close the water supply and return valves to

isolate boiler.

4. Close external gas supply valve.

5. Open relief valve to vent water pressure.