beautypg.com

Control panel operating procedures – AERCO BMK 3.0 LN Nat. Gas APRIL 2009 User Manual

Page 30

background image

CONTROL PANEL OPERATING PROCEDURES

Figure 3-3.

SS

s

3. With all required safety device switches

rgizes and turns

alve rotates to the full-

how

wer proof switch on the Air/Fuel

OV Location

closed, a purge cycle will be initiated and the
following events will occur:

(a) The Blower relay ene

on the Blower.

(b) The Air/Fuel V

open purge position and closes purge
position switch. The dial on the Air/Fuel
Valve (Figure 3-4) will read 100 to
indicate that it is full-open (100%).

(c) The FIRE RATE bargraph will s

100%.

4. Next, the blo

Valve (Figure 3-5) closes. The display will
show Purging and indicate the elapsed time
of the purge cycle in seconds. The normal
(default) time for the purge cycle is 10
seconds.

100

DETAIL “A”

T

O

B

L

OWE

R

AI

R I

N

DIAL

(DETAIL “A”)

STEPPER

MOTOR

Figure 3-4.

Air/Fuel Valve In Purge Position

Figure 3-5.

Blower Proof Switch

3-8