beautypg.com

Count direction, English, Installation / preparation for commissioning – Pilz PSEN enc s2 eCAM User Manual

Page 36: M1 m2

background image

Installation / Preparation for commissioning

34

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Deutschland

Telefon +49 711 3409-0, Telefax +49 711 3409-133, E-Mail: [email protected]

English

5.7 Count direction

Fig. 11: Setting the count direction


M1: Setting for measuring channel 1
M2: Setting for measuring channel 1


Permitted switch settings measuring channel 1/ measuring channel 2:

DIP 1

DIP-Schalter 2

Count direction

OFF ON

Increasing in clockwise direction, viewed towards the flange
connection

ON OFF

Decreasing in clockwise direction, viewed towards the flange
connection


NOTICE

The count direction for measuring channel 1 and
measuring channel 2 must be set in opposite
direction!


M1

M2

This manual is related to the following products: