English, Installation / preparation for commissioning – Pilz PSEN enc s2 eCAM User Manual
Page 34
Installation / Preparation for commissioning
32
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Deutschland
Telefon +49 711 3409-0, Telefax +49 711 3409-133, E-Mail: [email protected]
English
Cable screw connection assembly, type B
Pos. 1 Union nut
Pos. 2 Clamping insert
Pos. 3 Inner O-ring
Pos. 4 Screw socket
1. Trim the shield braid / shield foil to the dimension "X" + 2 mm.
2. Slide the union nut (1) and clamping insert (2) over the cable.
3. Bend the shield braid / shield foil by approx. 90°.
4. Slide the clamping insert (2) up to the shield braid / shield foil and wrap the
braid back around the clamping insert (2), so that the braid goes over the
inner O-ring (3) but not over the cylindrical part or the torque supports.
5. Fit the screw socket (4) on the housing.
6. Push the clamping insert (2) into the screw sockets (4), so that the torque
supports fit into the lengthwise slots provided in the screw socket (4).
7. Screw the union nut (1) to the screw socket (4).