Calibrate and verify the device – Welch Allyn Connex Vital Signs Monitor PMP Tab Instructions - Quick Reference Guide User Manual
Page 21

Calibrate and verify the device
1. Click within the device row, then click Perform All to activate the test sequence for the
module.
2. Enter information about any replacement parts used during service of the product. After
entering the part information, click Begin to start the tests.
3. Follow the onscreen prompts in the right side pane of the test window to progress through the
test sequence.
The left pane shows the order of the required tests and tracks the test sequence progress. As
the Welch Allyn Service Tool application completes each test, the pass/fail indicator changes
to green for pass or red for fail, and the application proceeds to the next test.
4. To terminate the active test sequence at any time, click Abort. To terminate alltests, click
Abort All.
After the Welch Allyn Service Tool application completes all the tests, it displays the pass/fail
test results. After you have finished reviewing the test results, click Close.
On the Device information tab, the Welch Allyn Service Tool updates to the last successful
date that calibration was performed. The only way to change the last calibrate date of service
is to perform all tests and all tests pass. Any test failure will not change the calibration date.
To see the updated calibration date, close the PMP tab and reopen.
17