EFCO 8800 Series Assembly Instructions Vol.5 User Manual
Page 32

EFCO 2009
Page 32
Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5
Section 23 - SSG Vent Unit Glazing at Stack Sill : C. Adapter Installation
Figure 45
HEAD
SILL
7. Drill tap sized holes (.113 diameter or #33 drill) in the face of the vertical assemblies, 1” from the sill end of the vent opening, and 18” on center to the top of
the vent opening. See figure 46 below. Drill the holes in the groove formed where the adapter meets the mullion. The holes should penetrate the adapter,
the isolator, and the first wall of the mullion where the isolator is seated. See Figure 47 below. Ensure the adapter is properly positioned and seated into the
isolator before drilling.
8. Apply STC6 fasteners in each hole to retain the adapters where they span the vent opening.
Concealed Vent
opening
Drill tap sized holes in the face of the
vertical assembly 1” from the sill end
of the vent opening, and 18” on
center to the top of the vent opening.
Apply STC6 fasteners in each hole
to retain the adapters where they
span the vent opening.
Figure 47
Figure 46
Drill tap sized holes in the
groove formed where the
adapter meets the mullion.
Apply STC6 fasteners in each
hole to retain the adapters where
they span the vent opening.
STC6 18” o/c