Section 19 - frame assembly - vent at stack sill – EFCO 8800 Series Assembly Instructions Vol.5 User Manual
Page 13
![background image](/manuals/636015/13/background.png)
EFCO 2009
Page 13
Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5
Section 19 - Frame Assembly - Vent at Stack Sill
1. Assembly the concealed vent unit frame. Refer to Volume 1 and Volume 2 of the S-8000 Unitized Curtain Wall Assembly Instructions for assembly details as
noted below.
Figure 10
Refer to Volume 1, Page 32 - 33
for anchor assembly and
application.
Refer to Volume 1, Page 34 for
frame assembly.
Refer to Volume 1, Page 29 - 30
“Z” clip installation.
Refer to Volume 1, Page 26 for
mullion gasket installation.
Refer to Volume 1, Page 27 - 28
for Frame Pad application.
Stack Head
Refer to Volume 1, Page 35 for
Mullion Splice Bar application.
Intermediate
Horizontal
1H65 Concealed
Vent Stack Sill
17K2 Concealed
Vent Horizontal
H11B Frame Pad
Refer to Volume 1, Page 27 - 28
for frame pad application.
H11B Frame Pad
Refer to Volume 1, Page 27 - 28
for frame pad application.