Field operation – Great Plains YP825AR Operator Manual User Manual

Page 55

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

51

2014-06-17

Table of Contents

Index

401-923M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 22
and “Field Set-Up Checklists” on page 50.

Consult seed monitor for alarms during planting. Check
that reported rates are consistent with your plan.

When reloading seed and fertilizer, check consumption
against anticipated use to that point.

Liquid Fertilizer (Option) Checklist

Page

Check for correct orifice plates

a

a. Check Seed and Fertilizer Rate manual.

Check relief valve setting

59

Fill system with 100 gallons of water, and
check for leaks

-

Check all row unit lines connected, free of
kinks, and discharge tube/nozzles clear

-

Set valves for operation

44

Dry Fertilizer Checklist

Page

Uncouple drive shaft if no fertilizer is being
applied, otherwise …

60

Install correct DRIVING and DRIVEN
sprockets for desired fertilizer rate

a

a. Check Seed and Fertilizer Rate manual.

Check and adjust applicator tubes

61

Load fertilizer at field

41

Meters Checklist

Page

Corn?
Check timing of meters for twin-row

a

a. Refer to Seed and Fertilizer Rate manual.

Check chain tension. Re-connect any
loose idler tensioning springs.

-

Correct disks for seed

a

Start fan. Operate at field manifold
pressure.

47

Rotate meter drive shafts one turn disks
with seed.

49

First Pass Operation Checklist

Page

1.

Prime fertilizer system.

44

2.

Meter shutters set.

49

3.

Raise planter and line up at start of first
planting row.

35

4.

Prime meters with seed.
Leave fan running.

49

5.

Pull forward, lower planter, unfold marker
and begin planting for a short distance.

35

6.

Stop. Assess:
• planting depth
• seed spacing
• press wheel operation
• fertilizer application (if in use)

-

7.

Make necessary adjustments

53

8.

Resume planting.

-

Sharp Field Turns

a

Checklist

a. Monitor manifold pressure during end-of-pass

operations and turns. Adjust operations as needed
to maintain meter pressurization.

Page

1.

Raise planter, fold marker

37

2.

Make turn

3.

Lower planter, unfold marker

35

4.

Resume planting.

Suspending Planting Checklist

Page

1.

Stop tractor

-

2.

Fan hydraulic circuit to Float or Neutral

48

3.

Hydraulic drive circuit to Float or Neutral

-

4.

Raise planter, fold marker

35

Ending Planting Checklist

Page

1.

Suspend operations as above, then

2.

Fold planter

31

3.

Lights ON

-

4.

Transport

23

First Pass Operation Checklist

Page