beautypg.com

Preparation and setup, Initial setup, Post-delivery/seasonal setup – Great Plains YP825AR Operator Manual User Manual

Page 17: Pre-planting setup

background image

2014-06-17

Table of Contents

Index

401-923M

Great Plains Manufacturing, Inc.

Table of Contents

Index

13

Preparation and Setup

This section helps you prepare your tractor and
YP825AR Planter for use, and covers tasks that need to
be done seasonally, or when the tractor/planter
configuration changes.

Before using the planter in the field, you must hitch it to a
suitable tractor, inspect systems and level the planter.
Before using the planter for the first time, and periodically
thereafter, certain adjustments and calibrations are
required.

Initial Setup

See “Appendix C - Initial Setup” on page 150 for
first-time/infrequent setup tasks, including:

• Install seed monitor console in tractor (see

401-923M-QSG Quick Start Guide).

• Set marker extension (Option, page 151).

• Install any Options not factory- or dealer-installed.

Post-Delivery/Seasonal Setup

On initial delivery, use with a new tractor, and seasonally,
check and as necessary, complete these items before
continuing to the routine setup items:

• Bleed hydraulic system (page 105).

• De-grease exposed cylinder rods if so protected at last

storage.

Pre-Planting Setup

Complete this checklist before routine setup:
Read and understand “Important Safety

Information” on page 1.

❑ Check that all working parts are moving freely, bolts

are tight, and cotter pins are spread.

❑ Check that all grease fittings are in place and

lubricated. See “Lubrication and Scheduled
Maintenance
” on page 108.

❑ Check that all safety decals and reflectors are

correctly located and legible. Replace if damaged.
See “Safety Decals” on page 6.

❑ Inflate tires to pressure recommended and tighten

wheel bolts as specified. See “Tire Inflation Chart
on page 134.