3 hydraulic colour coding, 4 electrical hook-up, 5 beacon operation – Great Plains CDA600 Operator Manual User Manual
Page 26: 6 stow wheel chocks
Centurion CDA600
270-600M-ENG
24
2013-06-14
2. Transportation / Installation
2.7.3 Hydraulic Colour
Coding
The hydraulic Hoses are colour coded using
cable ties to identify the different circuits.
Hoses with 1 tie indicates the cylinder side
of the circuit while hoses with 2 ties indicate
the rod side.
P1
P2
Levelling board 1
Levelling board 2
Memory 1
Memory 2
Fan
Sump
Drain
2.7.4 Electrical Hook-up
Make sure tractor is shut down with
accessory power off before making
connections.
1. Mate lighting connector to tractor outlet.
2. Mate monitor connector to tractor
harness.
3. Mate any optional or after-market
electrical connectors.
Make connections prior to drill movement.
Some drill hydraulic circuits are under
monitor control.
2.7.5 Beacon Operation
The flash strobe beacon should be on in
all instances when the machine is being
transported or used. It is part of the main
light circuit and is on when the lights are on.
2.7.6 Stow Wheel Chocks
Verify that the tractor transmission is in
Park, and that the tractor’s parking brake
is set.
Two sets of wheel chocks (4 chocks total)
are provided to secure the drill when
parked. These provide the safety when
installed ahead and behind the transport
tyres.
If one chock is extremely difficult to remove,
and/or the drill moves significantly when the
chock is removed, investigate the cause
before removing the chocks on the other
side. If no tractor is hitched, or the tractor
is not securely parked, the drill could roll
away after chock removal, and cause an
accident resulting in death, serious injury
and substantial property damage.
Figure 3. Electrical Connectors