Checkout procedures, Solid-state 10-30v dc, Bn bl wh bu – Banner DUO-TOUCH Run Bar with STB Buttons User Manual
Page 8: Contact element 1 contact element 2
Solid-State
10-30V dc
V+
V+
bn
bl
wh
bu
Micro-
Controller
1
Micro-
Controller
2
+
–
Figure 7. STB Touch Button Block Diagram
Logic
STB2
+ –
STB1
+ –
Logic
Brown
Black
Black
Blue
White
White
Z1
Z2
S12
S11
S13
S22
S21
S23
AT-GM-13A
AT-HM-13A
Figure 8. Connection to Two STB Touch
Buttons with PNP Outputs
SC22-3
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10
A1 A1 A2 A2
01 02 03 04 05 06 07
STB1
STB2
Brown
Black
+24 V dc
+24 V dc
0 V dc
0 V dc
Blue
White
Black
White
Figure 9. Connection of Two STB Buttons to
the Banner Safety Controller
Connection of Emergency Stop Button
For models with an E-stop button, connection of the E-stop button is made at the screw terminals on the contact element
mounted on the mounting adapter.
Screw Terminals
Figure 10. E-Stop Wiring Terminals
Contact
Element 1
Contact
Element 2
Figure 11. E-Stop Wiring Diagram
WARNING: Multiple E-Stop Switches
Whenever two or more E-stop switches are connected to the same E-stop safety module, the
contacts of both switches must be connected together in series. This series combination is then
wired to the respective safety module input. Never connect the contacts of multiple E-stop
switches in parallel to the E-stop safety module inputs; this defeats the switch contact monitoring
ability of the safety module, and creates an unsafe condition which may result in serious injury or
death.
Checkout Procedures
Checkout procedures are dependent on what two-hand control system or module is interfaced with the DUO-TOUCH Run
Bar. At minimum, the procedure should include the requirements listed in the Applications section and the following steps.
DUO-TOUCH Run Bar with STB Buttons
8
www.bannerengineering.com - tel: 763-544-3164
Datasheet 131634_web Rev.
E