2 - loading an application, Objectives, Power source – Rockwell Automation 2707-L40X_L8X_V40X DTAM Plus Operator Interface Module Installation Instructions User Manual
Page 27: Loading an application
A–B
2
Chapter
2–1
Loading an Application
This chapter describes how to apply power and transfer applications between
the offline programing software (DPS) and the DTAM Plus.
Section
Page
Power Source
2–1
Applying Power
2–2
Powerup Sequence
2–3
Upload/Download DIP Switch Settings
2–5
Upload/Download RS-232 Connections
2–6
Upload/Download RS-485 Connections
2–7
Computer Setup
2–7
Downloading an Application
2–8
Uploading an Application
2–13
This section describes power connections for initial desktop setup and
programming. Refer to Chapter 5 for installation wiring instructions.
The DTAM Plus is available in two voltage ranges:
•
Versions with P1 power supply, accepts 15-23V AC (47 to 440 Hz)
or 20-30V DC
•
Series D versions with P1 power supply only, accepts 20-30V DC
•
Versions with P2 power supply, accepts 85-265V AC (47 to 440 Hz) or
110-300V DC
!
ATTENTION: Verify that the power is disconnected from the
power source before wiring. Failure to disconnect power may
result in electrical shock.
Make sure that the supply voltage matches the voltage label on
the back of the DTAM Plus. The incorrect voltage may damage
the DTAM Plus.
Do not overtighten the power connector screw terminals.
Overtightening the terminals may damage the DTAM Plus.
Objectives
Power Source