beautypg.com

Step 3 – sequence of final assembly – Rockwell Automation 1512A MV Controllers, 400A One-High Cabinet, Standard and Arc-Resistant Enclosure User Manual

Page 86

background image

78

Rockwell Automation Publication 1512A-UM100F-EN-P - May 2013

Appendix B

ArcShield Plenum Installation Instructions

Figure 76 - Aligning “Side-by-Side” Plenums

STEP 3 – Sequence of Final
Assembly

All Plenums in a Line-up must be mounted to the top of each enclosure and to
the Plenum directly beside it before the front duct sections are re-attached (see

Figure 72

).

Figure 77 - Sequence of Final Assembly

IMPORTANT

Any unused holes must be filled with thread forming screws. i.e.: “Lifting Lug
holes”.

All gaps must be sealed and filled with silicone.

End Cover Plate