Figure 43 - Contactor Voltage Checkpoints

7. Use the Door Interlock Circumvention procedure (refer to

Door Interlock

Circumvention on page 40

) to move the isolation switch handle to the

ON position.

8. Check the isolation switch blades with a hot stick or appropriate voltage

measuring device to verify that they are voltage free (see

Figure 44

).

Figure 44 - Isolation Switch Voltage Check Points

9. Once all power circuits are verified to be voltage free, move the isolation

switch handle back to the OFF position. The unit is now safe to service.

Fuse Removal and
Replacement

Check line-side power here

Check load-side power here

Isolation Switch Blades must

fully engage Incoming Line Stabs

Check incoming line voltage here

ATTENTION: Only personnel who have been trained and understand the
Bulletin 1500 product line are to work on this equipment. Suitable safety
equipment and procedures are to be used at all times.