Grounding -11, Sensitive circuits -11, Te (true earth) termination -11 – Rockwell Automation 1336R REGEN LINE REG User Manual
Page 63: Pe (power earth) termination -11, 480vac power wiring, D frame, Fig re 3 4 — regenerative brake gro nding, Regenerative brake operation 3–11, Ac drive, 1336 regen precharge

Regenerative Brake Operation
3–11
380-480VAC Power
Wiring
Grounding
All 1336 REGEN components must be connected to system
ground at the PE power ground terminal provided. Ground
impedance must conform to the requirements of national and local
industrial safety regulations (NEC, CENELEC, etc.), and should
be inspected and tested at appropriate intervals. In any cabinet, a
single low-impedance ground point or ground bus bar should be
used. All circuits should be grounded independently and directly.
The AC supply ground conductor should also be connected
directly to this ground point or bus bar.
Fig re 3 4 — Regenerative Brake Gro nding
PE
PE
GND
GND
PE
Conduit/4-Wire Cable
Nearest
Building Structure Steel
USER
SUPPLIED
120V AC
1336 REGEN
Converter
1321 3%
Line Reactor
GND
1
(2) jumpers connect PE and TE at the 1336 REGEN
Converter Main Terminal Block. Consult
Allen-Bradley Application Engineering prior
to removing either jumper.
S2
TORQUE TERM. TO 6 N-m (52 lb-in)
T2
USE 75
°
C COPPER WIRE ONLY
R2
DC–
DC+
TE
PE
PE
120
RT
N
120
VA
C
1
1
PE
PE
AC DRIVE
PE
1336 REGEN
Precharge
R1
S1
T1
A1
B1
C1
A2
B2
C2
R2
S2
T2
+DC
+DC
–DC
–DC
1
PE TE
R
S
T
TB1-1
TB1-3
120V
AC
120 RTN
D Frame
2
2
Important:
If you are using a Regenerative Brake with a B Frame
AC drive, refer to the Power-up Sequence on page 3-3.
Sensitive Circuits
It is essential to define paths
through which high frequency
ground currents flow to ensure that
sensitive circuits do not share a
path with these currents. Control
and signal conductors should not
be run near or parallel to power
conductors.
TE (True Earth) Termination
The converter’s TE terminals are
used for all control signal shields
internal to the 1336 REGEN
Converter and must be connected
to the converter’s TE
terminals by a separate
continuous lead.
PE (Power Earth) Termination
A safety ground is required by
code. This point must be
connected to adjacent building
steel or a floor ground rod
provided grounding points comply
with NEC and local regulations.