Rockwell Automation 1336R REGEN LINE REG User Manual
Page 126

I–6
Index
Instantaneous Overcurrent Trip Filter
Constant - Par. No. 11 - Regen Brake
Operation Only, 3-36
Instantaneous Overcurrent Trip Level
- Par. No. 14, 2-31, 3-36
Integral Gain - Par. No. 8 - Regen DC
Bus Supply Operation Only, 2-30
Logic Status - Par. No. 26, 2-34, 3-39
Motoring Current Limit - Par. No. 12 -
Regen DC Bus Supply Operation
Only, 2-31
Operational Mode - Par. No. 1, 2-29,
3-34
Peak Load - Par. No. 4, 2-29, 3-34
Phase Locked Loop Error Trip Point -
Par. No. 22, 2-33, 3-38
Port Enabled Mask - Par. No. 23,
2-34, 3-39
Proportional Gain - Par. No. 7 -
Regen DC Bus Supply Operation
Only, 2-30
Rated AC Line Current Par. No. 2,
2-29, 3-34
Regen Current Limit - Par. No. 13,
2-31, 3-36
Shift Angle Constant - Par. No. 10 -
Regen Brake Operation Only, 3-35
Start/Stop Owner - Par. No. 24, 2-34,
3-39
Voltage Feedback Filter Bandwidth -
Par. No. 15, 2-31, 3-36
Voltage Reference - Par. No. 6 -
Regen DC Bus Supply Operation
Only, 2-30
Parameters Operational Mode, 2-29, 3-34
PE (Power Earth) Termination, 2-6, 3-11
phase-to-ground protection, 2-5, 3-10
phase-to-phase protection, 2-5, 3-10
Programming Conventions, 2-28, 3-33
Programming Overview, 2-28, 3-33
R
regenerative brake configuration
requirements, 3-4
Regenerative Brake Layout, 3-2
Regenerative Brake Mode - required
information, 3-4
Regenerative Brake Operation, 3-1
Regenerative Brake Sizing (steps), 3-4
Regenerative Brake Startup - Initial
Operation, 3-30
Regenerative DC Bus Supply Layout, 2-2
Regenerative DC Bus Supply Mode, 1-2
Regenerative DC Bus Supply Sizing
(steps), 2-3
Regenerative DC Bus Supply Startup -
Initial Operation, 2-26
Regenerative DC Bus Supply Operation,
2-1
S
Sync Cable (Regen DC Bus Supply), 2-15,
3-20
T
TE (True Earth) Termination, 2-6, 3-11
total drive power (Regen DC BUS Supply
Mode), 2-3
U
Ungrounded Distribution Systems, 2-3,
2-5, 3-8, 3-10
V
Variable Bus Voltage Operation, 2-27