SDC SK-L90 FIELD ELECTRIFICATION KIT SCHLAGE L9000 MORTISE LOCKSET User Manual
Failsecure failsafe failsecure failsafe, Remove grease from shaded area
INSTALLATION INSTRUCTIONS
SK-L90 FIELD ELECTRIFICATION KIT
SCHLAGE L9000 MORTISE LOCKSET
P:\INSTALLATION INST\ELECTRIFIED LOCKSETS\INST-SK-L90.vsd REV B 10-13 Page 1
Any suggestions or comments to this instruction or
product are welcome. Please contact us through
our website or email [email protected]
801 Avenida Acaso, Camarillo, Ca. 93012 • (805) 494-0622 •
www.sdcsecurity.com • E-mail: [email protected]
3
Remove burrs and sharp
edges where indicated.
Assemble and install Locking
Slide Components as shown.
Set the Solenoid assembly
inside the Solenoid holder.
File off all burrs &
sharp edges.
Remove all grease
+
-
BLK
BLU
12 VDC @ .6 AMP
+
-
RED
WHT
BLK
BLU
24 VDC @ .3 AMP
RED
WHT
Dual Coil Solenoid
Failsecure
Failsafe
Failsecure
Failsafe
NOTE: L9080 requires spring cage for outside lever
1
Remove cover and
components indicated below.
Discard
2
Remove grease from inside of
case where indicated.
Attach Solenoid Holder to case.
Use supplied screw through the
top of the case where shown.
Remove grease from
shaded area
4
Attach Solenoid to Slide Arm and route wires
as shown. Use cable tie for strain relief.
Re-attach components from Step Two
(except the pin). Re-install cover and test
Lock.