beautypg.com

SDC SK-L90 FIELD ELECTRIFICATION KIT SCHLAGE L9000 MORTISE LOCKSET User Manual

Failsecure failsafe failsecure failsafe, Remove grease from shaded area

background image

INSTALLATION INSTRUCTIONS

SK-L90 FIELD ELECTRIFICATION KIT

SCHLAGE L9000 MORTISE LOCKSET

P:\INSTALLATION INST\ELECTRIFIED LOCKSETS\INST-SK-L90.vsd REV B 10-13 Page 1

Any suggestions or comments to this instruction or

product are welcome. Please contact us through

our website or email [email protected]

801 Avenida Acaso, Camarillo, Ca. 93012 • (805) 494-0622 •
www.sdcsecurity.com • E-mail: [email protected]

3

Remove burrs and sharp
edges where indicated.
Assemble and install Locking
Slide Components as shown.
Set the Solenoid assembly
inside the Solenoid holder.

File off all burrs &
sharp edges.
Remove all grease

+

-

BLK

BLU

12 VDC @ .6 AMP

+

-

RED

WHT

BLK

BLU

24 VDC @ .3 AMP

RED

WHT

Dual Coil Solenoid

Failsecure

Failsafe

Failsecure

Failsafe

NOTE: L9080 requires spring cage for outside lever

1

Remove cover and
components indicated below.

Discard

2

Remove grease from inside of
case where indicated.
Attach Solenoid Holder to case.
Use supplied screw through the
top of the case where shown.

Remove grease from
shaded area

4

Attach Solenoid to Slide Arm and route wires
as shown. Use cable tie for strain relief.
Re-attach components from Step Two
(except the pin). Re-install cover and test
Lock.