Transporting and lifting procedures – Multiquip WRS5200DFPU (KUBOTA WG972-GL-E3 DUAL FUEL) User Manual
Page 15
wrs5200dfpu hYdrauLIC roLLer sCreed • operatIon manuaL — rev. #0 (08/18/14) — page 15
transPorting anD lifting ProceDUres
LIftIng the sCreed
The following procedure and Figure 1 describe how to lift
the screed.
warnIng
never lift the screed with the power unit attached.
ALWAYS remove the power unit from the screed before
lifting or transporting.
1. Utilize a spreader bar of proper length and lifting
capacity. Secure lifting straps from both ends of the
spreader bar to each of the four (4) lift loops on the
screed. There are two (2) lift loops on the operator end
and two (2) lift loops on the engine end of the screed.
2. Connect five (5) lifting cables from the spreader bar
to the lifting hook of a crane or forklift. Ensure that the
lifting hook and chain are of appropriate lifting capacity.
3. Use crane or forklift to hoist screed onto a flatbed truck
for transporting.
Figure 1. Lifting the Screed
SPREADER BAR