4 control system configuration, Control system configuration, Commissioning – Lenze 931K User Manual
Page 27

Commissioning
Control system configuration
l
27
KHB 13.0004−EN 2.1
6.4
Control system configuration
The control system must be configured before communication with the controller is
possible.
Installing the device data base file (*.GSE)
For the configuration you have to install the device data base file "931E0A6D.GSE" on the
master.
1. Download the GSE file from the Internet.
– You can find the GSE file in the "Services & Downloads" area at
http://www.Lenze.com.
2. Install the GSE file.
– Installation notes are given in the documentation for the master and in the
documentation for the configuration tool.
Creating a project
ƒ
Please refer to the documentation for the configuration tool if you want to create a
project.
)
Note!
Use of data consistency
ƒ
We recommend to use exclusively configurations with consistency to avoid
data conflicts between the PROFIBUS−DP master and the CPU of the control
system.
– If the telegram has, for instance, a length of 8 bytes of data, the PLC must
be able to process the 8 bytes of data continuously (consistently).
ƒ
Detailed description of consistency: (
¶ 18)
ƒ
Please note that the processing of consistent data varies between different
control systems. This must be considered in the configuration tool.
– It may be necessary to use system functions of the PLC to ensure the data
consistency.
– Please refer to the documentation for the PLC to find out which data
length can be processed consistently by the CPU.