Commissioning
For commissioning the visualisation system you need an Engineering PC. This can be a standard
laptop.
The programs required for configuring, parameterising, and commissioning the visualisation
system are installed on the Engineering PC.
[5-1]
Example configuration with IPCs of the EL series
[5-2]
Example configuration with 3200 C controllers (connected to each other via an internal switch)
The Engineering PC...
• is connected with the Industrial PC (IPC)/controller via Ethernet.
• is used to transfer the runtime software to the IPC/controller.
The Engineering PC is not required for operating the visualisation system. It can be used to configure
an optional number of Industrial PCs.
"»VisiWinNET®« - Getting started" software manual/online help
Here you'll find more information relating to the commissioning of an Industrial PC/
controller as visualisation device.