Instrument setup, 1 installation site requirements, 1 moving the instrument – Leica Biosystems ASP300 S User Manual
Page 23: Initial operation, Installation site requirements
![background image](/manuals/565440/23/background.png)
24
Leica ASP300 S
4. Initial Operation
4.1.1 Moving the instrument
After unpacking the instrument (see Unpack-
ing instructions on the outside of the transport
crate), handle it only by the handles marked with
" " to move it to its final location.
When operating the instrument, the brakes on
the instrument casters (24) must be engaged.
• The instrument requires an installation area of
approx. 650 x 700 mm with vibration-free floor.
• Room temperature consistently between
+15 °C and +35 °C.
• Relative air humidity maximum 80 %, non-
condensing.
• Avoid vibrations, direct sunlight and heavy
variations in temperature.
24
The chemicals to be used in the Leica
ASP300 S are both flammable and nox-
ious. The installation site for the Leica
ASP300 S must be well ventilated, and
there must be no ignition sources of
any kind in the area. Never operate the
instrument in rooms with an explosion
hazard.
The instrument must be set up so that
the power switch on the rear side
of the instrument (
Fig. 4, 42
) is easily
accessible at any time.
4.1 Installation site requirements