beautypg.com

Flint & Walling CPJS Shallow Well User Manual

Page 10

background image

10

WELL TO PUMP CONNECTION (SUCTION PIPE)

4b. For driven wells, a check valve is required at the top of

the well to maintain prime. Flow arrow must point toward

pump. (Fig. 4b)

IL1475

Pump

Flow Arrow

4b

IL1396

2

IL1395

Tape

1

2. Finish the connection to your well with additional pipe and

fittings as needed. (Fig. 2)

1. Make the connection to your well. Wrap all threaded

fittings with pipe tape 5 times or apply a pipe paste

(pipe dope) to ensure an air tight connection. (Fig. 1)

Deep Well Application Only:

IL1397

5

5. Finish the connection to your well with additional pipe and

fittings as needed. (Fig. 5)

This manual is related to the following products: