Before applying power to the rack, Installing advanced features (af) cards (optional), Installing the control electronics module (cem3) – ETC Sensor3 CE (ESR3) Rack User Manual
Page 39
5
Finishing Installation
31
Checking Rack Installation before Installing Modules
It is a good idea to check the installation before applying power to the rack.
Before Applying Power to the Rack
Step 1:
Clean out dust, metal scraps or other debris from the rack interior.
•
ETC recommends vacuuming the rack interior before installing modules.
Step 2:
Check for loose connections, bare wires or damaged insulation.
Step 3:
Correct air leaks caused by misaligned or removed panels, empty screw holes,
or conduit openings.
Step 4:
Remove the cardboard protective cover from the top fan grille. Spin the top
cooling fan to be sure it is not obstructed.
Step 5:
Check resistance between phases, Neutral and Earth for short circuits:
a: Phase to Phase; resistance should be 500k ohms or higher
b: Phases to Earth; resistance should be 500k ohms or higher
c: Neutral to Earth; resistance should be very close to 0 ohms
d: Phases to Neutral; resistance should be 500k ohms or higher
Installing Advanced Features (AF) Cards (Optional)
If your rack is an Advanced Features
rack, it should be supplied with AF cards
from the factory. Normally these will be
pre-fitted for you, however if you do need
to fit the cards use the following
procedure:
Step 1:
Address your AF cards using
the DIP switches as shown in
Step 2:
Locate the AF card slots at the
right hand side of the rack
Step 3:
Insert the AF cards into the
slots and push until securely seated, a tangible click occurs when fully inserted.
Installing the Control Electronics Module (CEM3)
Step 1:
Inspect the CEM3 for loose components or other shipping damage.
Step 2:
Slide the CEM3 into the rack.
Step 3:
Push on either side of the CEM3 until it is flush with the front of the rack. Do not
push in the centre as you may cause damage to the display.
W A R N I N G :
RISK OF ELECTRIC SHOCK! Power must be turned OFF when you perform
this procedure.
AF Card Addressing
Card 1
Card 2
Card 3
Card 4
S
W
1
S
W
2
S
W
3
S
W
4
1
ESR3-12
ESR3-24
ESR3-48
2
3
4
Sensor+
Off = Switch in down position
ESR3-36
Figure 34: AF3 Card Addressing