ETC Sensor+ Touring Rack CEM+ to CEM3 Retrofit User Manual
ETC Sensors
Table of contents
Document Outline
- Introduction
- Unpack and Organize
- The Retrofit
- Rack Geography
- Preparation
- Remove the Old
- Control Input Panel Replacement
- Power Termination
- Data Cabling Preparation
- Spider Board Retrofit (only SP96 Large or “Double Small”)
- Make Connections and Install the New Backplane
- Replace AF Cards (AF Racks Only)
- Upgrading the Rack Door
- Finish Up
- Verify the Retrofit
- Configure the CEM3