High pressure relief valve adjustments, Removal and inspection of charge pump, Torque specs for relief valves into port block -62 – JLG 1250AJP Service Manual User Manual
Page 416
![background image](/manuals/551887/416/background.png)
SECTION 5 - HYDRAULICS
5-62
– JLG Lift –
3121171
the control spring are correctly located in the grooves
near the end of the feedback lever arms.
High Pressure Relief Valve Adjustments
1. Remove relief valve cover from pump (ref. item 1).
2. Loosen jam screw (ref. item 2).
3. Holding spring loading nut (ref. item 4) rotate valve
spindle (ref. item 3). For high range relief valve, one
turn equals approximately 630 psi (44 bar). For low
range relief valve, one turn equals approximately
377 psi (26 bar).
4. After adjustment is completed torque jam screw (ref.
item 4) to 5 ft.lb. (7 Nm).
5. Install relief valve assembly into pump, reinstall
cover (ref. item 1) to proper torque.
Removal and inspection of charge pump
Before removing cap screws, mark the position of the
charge pump housing and separator plate in relation to
the port block.
Loosen screws with metric allen wrench.
Remove charge pump housing and inspect for wear or
damage to gear set and 0-ring seals. Grease 0-rings prior
Table 5-3. Torque Specs for Relief Valves into Port Block
Pump Size
Wrench Size
Torque
28
32 mm
66 ft.lb. (90 Nm)
Pump Size
Allen Wrench
28
8 mm