DIRECT GAS FIRED AIR MAKE-UP
START-UP REPORT
INSTALLATION & MAINTENANCE
Job Name:
Date:
Address:
Model No:
City & State:
Order No:
Serial No:
**WARNING** BEFORE STARTING UP AIR MAKE-UP UNIT READ SAFETY INSTRUCTIONS OF THE MAN-
UAL TO ENSURE THAT YOU OR ANY PERSONNEL AT THE INSTALLATION SITE ARE NOT EXPOSED
TO AN UNSAFE OPERATING CONDITION WHICH COULD BE DETRIMENTAL TO THEIR SAFETY.
Note: All units were test run and fired at the factory. The following steps assure no damage occurred in shipment.
1. Any visible shipping damage to unit. Describe:
2. All shipping straps, braces, tie downs removed.
3. Unit installed level and secure.
4. All seams properly caulked where unit was assembled in two or more sections.
5. All filters installed in racks properly with airflow in proper direction.
6. Bolts on taper lock bushings securing wheel and drive sheaves have been checked to be sure that they
are tight.
7. Bolts on motors and bearings have been checked to be sure that they are tight and drives are properly
aligned.
8. Bearings checked for proper lubrication.
9. Belt tension checked.
10. Rotate wheel to make sure nothing is rubbing and bearings, allow to rotate without binding.
11. Check air inlet and discharge areas for debris which could be drawn into fan wheel or blown into dis
charge area.
12. Check all electrical wiring to be sure connections are tight and are making good contact.
13. Blow out all new supply piping lines with air before connecting to the pipe train to be sure they are free
from foreign materials that could prevent proper seating of safety shut off valves
(strainers are
suggested).
14. Bleed gas supply line of air before starting unit. Reference ANSI procedures Z223.1, latest edition. (Unit
will lock out on safe shut down until raw gas reaches the gas train and pilot lights off.)