4 no load offset compensation flow diagram, An366, Figure 43. meter test equipment – Cirrus Logic AN366 User Manual
Page 47

AN366
47
6.2.4 No Load Offset Compensation Flow Diagram
The following flow diagram shows the implemented of no load power offset compensation using the
CDB5484U and a PC as the controller. The MTE Meter Test Equipment source is used to provide the source
voltage and no load current. Each step of the flow shows the CDB5484 GUI screen capture of execution
and reading results. The register writes and reads are all identified for easy compares to the GUI screen.
APPLY FULL SCALE VOLTAGE AND ZERO LOAD CURRENT
(See Figure 43.)
Figure 43. Meter Test Equipment
FROM MAIN
FLOW
CLEAR DRDY
APPLY FULL
SCALE VOLTAGE
AND ZERO LOAD
CURRENT
DRDY
SET?
TSETTLE = 2000
Sample Count
N = 16000
Shown
In
Main
Flow
NO
YES
1
START
CONTINUOUS
CONVERT
0xD5
See also other documents in the category Cirrus Logic Hardware:
- CobraNet (147 pages)
- CS4961xx (54 pages)
- CS150x (8 pages)
- CS1501 (16 pages)
- CS1601 (2 pages)
- CS1601 (16 pages)
- CS1610 (16 pages)
- CRD1610-8W (24 pages)
- CRD1611-8W (25 pages)
- CDB1610-8W (21 pages)
- CS1610A (18 pages)
- CDB1611-8W (21 pages)
- CDB1610A-8W (21 pages)
- CDB1611A-8W (21 pages)
- CRD1610A-8W (24 pages)
- CRD1611A-8W (25 pages)
- CS1615 (16 pages)
- AN403 (15 pages)
- AN401 (14 pages)
- AN400 (15 pages)
- AN375 (27 pages)
- AN376 (9 pages)
- CRD1615-8W (22 pages)
- CRD1616-8W (23 pages)
- AN402 (14 pages)
- AN404 (15 pages)
- CRD1615A-8W (21 pages)
- CS1615A (16 pages)
- CS1630 (56 pages)
- AN374 (35 pages)
- AN368 (80 pages)
- CRD1630-10W (24 pages)
- CRD1631-10W (25 pages)
- CS1680 (16 pages)
- AN405 (13 pages)
- AN379 (31 pages)
- CRD1680-7W (31 pages)
- AN335 (10 pages)
- AN334 (6 pages)
- AN312 (14 pages)
- AN Integrating CobraNet into Audio Products (16 pages)
- CobraNet Audio Routing Primer (9 pages)
- Bundle Assignments in CobraNet Systems (3 pages)
- CS2300-01 (3 pages)
- CS2000-CP (38 pages)