Report – WIKA Pascal ET User Manual
Page 72
6 Commissioning, operation
72 WIKA Operating Instruction, Pascal ET and Pascal ET/IS
GB
6.6
Report
To create a report one channel has to be set as REF (Reference) and another one as DUT (Device
Under Test): reference signal and direct measurement (or manual input by keyboard) are required.
For the REFERENCE: remember to set the range equivalent to the one of the DUT. When the
channel is assigned as reference, the symbol REF will appear.
For the DUT: remember to define the max error and the declaration. A bargraph will be displayed
on the DUT channel. When the channel is device under test, the symbol DUT will appear.
Press REPORT, the below menu is displayed:
VIEW RPT
View Reports
SETUPRPT
Set up Reports
DEL.RPTS
deletes all the Reports
VIEW PRC
View Procedures
SETUPPRC Set up Procedures
DEL.PRCS
Delete all the Procedures
Figure 85
– Report menu
Press SETUPRPT to create a new Report.
Info required are:
Report name
DUT model (Device Under Test)
DUT Serial Number (Device Under Test)
Operator
Job Number
Found Left
Up Down
N. Points