WIKA Pascal ET User Manual
Page 66
6 Commissioning, operation
66 WIKA Operating Instruction, Pascal ET and Pascal ET/IS
GB
Press SETUP to set the ramp:
Figure 72
– Ramp parameters setup
Here above a ramp has been set: starting from 0 V, in 11 steps it reaches 1 V after 20 sec.: then it
remains standstill for 5 sec. The ramp will be executed 2 times (Cycles num.).
Press OUT A to start the ramp function: the instrument will show the main screen and the writing
RMP will be displayed to show that the function ramp is active.
Figure 73 - Ramp running
If another channel is assigned to OUT B, here below you can see how the Ramp will be shown:
Figure 74
– Ramp setup with both OUTs
OUT A & B are both available. The Ramp can start for both the channels simultaneously
See also other documents in the category WIKA Measuring instruments:
- 890.09.2190 (44 pages)
- A-10 (96 pages)
- A2G-50 (52 pages)
- A2G-55 (36 pages)
- AC-1 (88 pages)
- C-2 (24 pages)
- D-10-7 (112 pages)
- D-20-9 (51 pages)
- D-20-9 (35 pages)
- DG-10 (112 pages)
- DP-10 (44 pages)
- DPT-10 (96 pages)
- DPT-10 (92 pages)
- GCS-1 (76 pages)
- HP-2 (84 pages)
- IL-10 (31 pages)
- IPT-10 (56 pages)
- IPT-10 (48 pages)
- IPT-10 (28 pages)
- IPT-10 (36 pages)
- IS-20-F (7 pages)
- IS-20-F (43 pages)
- IS-20-H (7 pages)
- UT-10 (52 pages)
- UT-10 (42 pages)
- IUT-10 (78 pages)
- LH-10 (60 pages)
- LH-20 (60 pages)
- LS-10 (60 pages)
- MG-1 (92 pages)
- MH-1 (11 pages)
- MH-2 (9 pages)
- MHC-1 (84 pages)
- N-10 (35 pages)
- O-10 (108 pages)
- OT-1 (60 pages)
- P-30 (92 pages)
- PSA-31 (124 pages)
- PSD-30 (128 pages)
- R-1 (92 pages)
- S-10 (35 pages)
- S-11 (102 pages)
- S-20 (96 pages)
- S-20 (52 pages)
- SL-1 (21 pages)