A257, Assembly & installation instructions – Hubbardton Forge 138585 User Manual
Page 2

Assembly & Installation Instructions
A257
For Aura Pendant 13-8585
Page 2 of 3
Hand-Forged,
Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
24787
8. Pull supply wire (I) out through the back of the canopy (D).
9. Raise the canopy (D) to the ceiling and attach to ceiling
bracket (A) with two flat head screws (J) threaded into two
threaded standoffs (K) (Figure 4).
10. Pull supply wire (I) through canopy (D) out through the center
hole in canopy (D).
11. Thread strain relief cap (H) onto strain relief (E) until snug.
12. Cut excess supply wire (I) allowing enough left (approx. 6”) to
make connections in the electrical box. Strip outside jacket
being careful not to cut through shielding of the two inner
conductors.
13. Run a pigtail lead from the ceiling bracket (A) using cupped
washer (L) and ground screw (M) to the junction box. Using
suitable wire connectors (not provided) connect unshielded
wire from supply wire (I) to all ground wires (bare copper or
green shielded) (Figure 5).
14. Using suitable wire connectors (not provided) connect
fixture wires to supply (wire with white tracer to white and
wire with no tracer to black).
Caution: Make sure wire
connectors are twisted on securely, and no bare wire is exposed.
15. Thread canopy nipple (N) in to threaded hole directly in
center of ceiling bracket (A).
16. Install canopy cover (O) on canopy nipple (N).
17. Thread lock up (P) on to canopy nipple (N). Tighten against
canopy cover (O) until snug.
18. Refer to instructions following to install bulb and glass.
(continued)
(Figure 5)
(Figure 4)
(Figure 6)