A111, Assembly & installation instructions – Hubbardton Forge 132200 User Manual
Page 3

Assembly & Installation Instructions
A111
For Trestle Four-Light Pendant 13-2200
Page 3 of 4
Hand-Forged,
Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
19830
To Install Bowl Glass
(Figure 4)
Component Parts
L Bulb
Shield
M Glass
N Bulb
O Socket
1. Slip glass (M) over socket (O).
2. Install light bulb (N). Be careful not to touch bulb
with bare hands; oil from the hands will
dramatically reduce bulb life.
3. Thread bulb shield (L) onto socket (O) (be careful
not to over tighten). Future bulb changes may be
accomplished by snapping glass portion of barrier
on and off rather than unthreading the holder.
(Figure 4)
To Install Diffuser/Shade
(Figure 5)
Component Parts
L Bulb
Shield
(Figure 5)
N Bulb
O Socket
P Shade
Q Diffuser
1. Slip diffuser (Q) over socket (O).
2. Install light bulb (N). Be careful not
to touch bulb with bare hands; oil
from the hands will dramatically
reduce bulb life.
3. Slip center ring of shade (P) over
socket until it rests on top of
diffuser (Q).
4. Thread bulb shield (L) onto socket
(O) (be careful not to over tighten).
Future bulb changes may be
accomplished by snapping glass
portion of barrier on and off rather
than unthreading the holder.
(continued)