beautypg.com

Chapter 2, Installing the management module, Verifying the package contents – Allied Telesis AT-MCM02 User Manual

Page 13: Reviewing the safety guidelines

background image

3

Chapter 2

Installing the Management Module

The installation procedures in this chapter should be performed by a network
technician who is familiar with Ethernet networks and Ethernet media
converters.

Verifying the Package Contents

Make sure the following items are included in your package. If any item is
missing or damaged, contact your Allied Telesyn sales representative.

One AT-MCM02 management module

One control cable with a miniDIN connector and a DB9 connector

This installation guide

Warranty card

Reviewing the Safety Guidelines

Please review the following safety guidelines before you begin to install the
management module in the media converter.

Laser
Class 1 laser device.

$ 6

Laser
Do not stare into the laser beam.

$ 7