beautypg.com

19 apply power and check startup sequence, 19 apply power and check startup sequence -27 – Allied Telesis 9400 iMAP User Manual

Page 31

background image

Data Management Cable (MGMT Port on Control Module)

Apply Power and Check Startup Sequence

1-27

Telesyn x400 - Installation Guide (Installation of ATI 9400)

1.19 Apply Power and Check Startup Sequence

1.

Turn the A and then B circuit breakers on (-).

2.

Observe that the fans should start and airflow should be begin horizontally through the unit.

3.

Observe the startup sequence on the terminal interface, which should show the following:

Note:

The startup sequence the user observes on the terminal may not exactly match the one
illustrated below. However, it should be free of any error messages.

@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@

Telesyn 6G Central Fabric Controller Boot Loader Version 3.0.g.01

Created on Thu 03/11/2004 at 9:07a

Copyright Allied Telesyn Networks, Inc., 2003

VxWorks Version 5.5 for IBM PowerPC 405GP Rev E

BSP version 1.2/2

Copyright Wind River Systems, Inc., 1984-2002

@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@

FPGA Version 1.4

Starting Telesyn Product Software Loading.

Attaching to Flash File System ... done.

/tffs/ - Volume is OK

Press any key to stop automatic loading of software image...

1 0

Automatically loading software image...

Loading from boot device 'emac'...

Active CFC or DebugIP enabled: MUX Enabled

Attached TCP/IP interface to emac0.

Attaching network interface lo0... done.

Loading... 21061184

Starting at 0x10000...