2 setup precautions, 2 setup precautions -8 – Allied Telesis 9400 iMAP User Manual
Page 12

ATI 9400 Installation
Setup Precautions
Telesyn x400 - Installation Guide (Installation of ATI 9400)
1-8
1.5.2 Setup Precautions
Voltmeter
1
Used to check the voltage at the terminal block
Double crimp
terminal
as needed
Required for ground wiring.
Crimping Tool
1
Used to put ring terminals on power cabling.
#2 Phillips
screwdriver
1
Used for mounting the chassis
Ring Terminals
#6 studs for 12 awg wire
RS232 cable
1
Used to connect local PC/terminal for local interface
Note: When using an AC-powered terminal or PC, use an
RS232 line isolation unit between the terminal/pc
and the RS232 port. For battery-powered devices
(laptop) this is not required.
cable ties
as needed
n/a
FCC - The ATI 9000 product complies with FCC requirements for
emissions radiation. Users of the ATI 9000 product are cautioned that
any changes or modifications not expressly approved by the party
responsible for FCC compliance could void the user’s authority to
operate the product.
FCC - The ATI 7400 product complies with FCC requirements for
emissions radiation. Users of the ATI 7400 product are cautioned that
any changes or modifications not expressly approved by the party
responsible for FCC compliance could void the user’s authority to
operate the product.
TABLE 1-3
Customer Item Checklist
Item
Quantity
Description