beautypg.com

2 setup precautions, 2 setup precautions -8 – Allied Telesis 9400 iMAP User Manual

Page 12

background image

ATI 9400 Installation

Setup Precautions

Telesyn x400 - Installation Guide (Installation of ATI 9400)

1-8

1.5.2 Setup Precautions

Voltmeter

1

Used to check the voltage at the terminal block

Double crimp
terminal

as needed

Required for ground wiring.

Crimping Tool

1

Used to put ring terminals on power cabling.

#2 Phillips
screwdriver

1

Used for mounting the chassis

Ring Terminals

#6 studs for 12 awg wire

RS232 cable

1

Used to connect local PC/terminal for local interface

Note: When using an AC-powered terminal or PC, use an

RS232 line isolation unit between the terminal/pc
and the RS232 port. For battery-powered devices
(laptop) this is not required.

cable ties

as needed

n/a

FCC - The ATI 9000 product complies with FCC requirements for
emissions radiation. Users of the ATI 9000 product are cautioned that
any changes or modifications not expressly approved by the party
responsible for FCC compliance could void the user’s authority to
operate the product.

FCC - The ATI 7400 product complies with FCC requirements for
emissions radiation. Users of the ATI 7400 product are cautioned that
any changes or modifications not expressly approved by the party
responsible for FCC compliance could void the user’s authority to
operate the product.

TABLE 1-3

Customer Item Checklist

Item

Quantity

Description