beautypg.com

Installing the switch in an equipment rack, This procedure requires the following items, Twelve bracket screws (included with the switch) – Allied Telesis AT-IX5-28GPX User Manual

Page 67: Flat-head screwdriver (not provided), Cross-head screwdriver (not provided)

background image

IX5-28GPX Installation Guide

67

Installing the Switch in an Equipment Rack

This procedure requires the following items:

ˆ

Twelve bracket screws (included with the switch)

ˆ

Two equipment rack brackets (included with the switch)

ˆ

Flat-head screwdriver (not provided)

ˆ

Cross-head screwdriver (not provided)

ˆ

Four standard equipment rack screws (not provided)

Installation guidelines may be found in “Choosing a Site for the Switches”
on page 56
. Here is the procedure for installing the switch horizontally or
vertically in a 19-inch equipment rack.

Caution

The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack. E28

1. Place the unit upside down on a level, secure surface.

Figure 23. Turning the Switch Upside Down

2. Using a flat-head screwdriver, pry the rubber feet from the bottom of

the switch, as shown in Figure 24.

Figure 24. Removing the Rubber Feet

2668

S2/28

S1/27

26

25

CONSOLE

IX5-28GPX

FDX

HDX COL

1000 LINK

ACT

10/100 LINK

ACT

SFP+

IX5-28GPX

1

2

2669