beautypg.com

ページ9, For the technician for the user – GReddy Profec User Manual

Page 10

background image

・Make sure that engine is cool when you begin the installation.

・ Make sure that hoses are long enough to reach valve unit, before you mount it.

・Before the installation, find the locations of wastegate, boost control solenoid

valve, fuel pressure regulator.

1. Display
2. SELECT switch
3. MODE switch
4. SET DIAL

Control unit

2

3

4

8

7

Power unit

5. Mounting flange
6. Main harness
7. Boost Pressure Sensor
8. Valve unit harness connector

1

5

6

Please read carefully

Product Description

Before Installation

Installation

Tools & Instruments

・Multi-meter (Over 15V measurement capability)
・Wire cutters
・ +Phillips and -Slotted Screwdrivers
・ Pliers

・10mm wrench
・Wire cutters
・ Soldering iron
・ Crimping tool

・Electrical tape
・Splice connectors
・ Soldering iron
・ Cable ties

For the technician

For the user

Please return this manual to the customer when installation and mounting are

completed.

When the person other than the owner uses a vehicle, please tell him/her that

Profec is installed and pass this instruction manual to the person.