Badger Meter ORION AMR/AMI Hardware Solutions for Gas Utilities User Manual
Page 29
Change and Program the Gas Drive Circle
1 Click the Change button in the Meter Information section of the IR Programming screen
Result: The Change Drive Circle window opens.
2 Locate the Drive Circle
•
Use the selections
in the top half of the
screen to filter the
list on the bottom by
choosing Integral or
Remote, and choosing
the Units, Dials and
Res (resolution)
•
Or just scroll through
the list in the bottom
half of the window to
find the drive circle for
the endpoint
3 Click to select the
drive circle
4 Tap in the Pressure field
Use the keyboard to
enter the pressure factor,
if applicable
Figure 33: Change Drive Circle
5 Tap Direction Then select the direction for the drive gear, if applicable
6 Align the optical head of the IR cable with gas endpoint IR LED port and click Program
Result: The new Meter
Information is displayed
on the IR Programming
screen and the Endpoint
Programmed Status
Indicator is selected.
Figure 34: Meter programmed
7 Visually verify the anticipated drive circle, direction and pressure compensation values are reflected in the Meter
Information section of the screen If they are not, repeat steps 1…6
IR PROGRAMMING
Page 29
April 2014
ORION® Endpoint Utility