beautypg.com

Badger Meter ORION AMR/AMI Hardware Solutions for Gas Utilities User Manual

Page 29

background image

Change and Program the Gas Drive Circle

1 Click the Change button in the Meter Information section of the IR Programming screen

Result: The Change Drive Circle window opens.

2 Locate the Drive Circle

Use the selections

in the top half of the

screen to filter the

list on the bottom by

choosing Integral or

Remote, and choosing

the Units, Dials and

Res (resolution)

Or just scroll through

the list in the bottom

half of the window to

find the drive circle for

the endpoint

3 Click to select the

drive circle

4 Tap in the Pressure field

Use the keyboard to

enter the pressure factor,

if applicable

Figure 33: Change Drive Circle

5 Tap Direction Then select the direction for the drive gear, if applicable
6 Align the optical head of the IR cable with gas endpoint IR LED port and click Program

Result: The new Meter

Information is displayed

on the IR Programming

screen and the Endpoint

Programmed Status

Indicator is selected.

Figure 34: Meter programmed

7 Visually verify the anticipated drive circle, direction and pressure compensation values are reflected in the Meter

Information section of the screen If they are not, repeat steps 1…6

IR PROGRAMMING

Page 29

April 2014

ORION® Endpoint Utility

This manual is related to the following products: