General requirements
To manage the ICX 6400-EPS1500, you will need a management station, such as a PC running a
terminal emulation application, for serial connection to the switch. Use the serial connection to perform
basic configuration tasks, including assigning an IP address and network mask to the system. This
information is required to manage the system using the CLI through Telnet or the Brocade Network
Advisor.
Summary of installation tasks
Follow the steps listed below to install your device. Details for each of these steps are provided on the
pages indicated.
Installation tasks
TABLE 12
Task number Task
Where to Find More Information
1
Ensure that the physical environment that will host
the device has the proper cabling and ventilation.
“Preparing the installation site” section
2
Unpack the device and all included accessories.
“Items included with the ICX_6400-EPS1500”
section
3
Install the device on a desktop, or in an equipment
rack.
“Installing the device” section
4
Once the device is installed, plug the device into a
nearby power source that adheres to the regulatory
requirements outlined in this manual.
“Powering on the system” section
5
Verify that the device is working properly by
plugging it into a power source and verifying that it
passes the self test.
“Verifying_proper_operation” section
Installation precautions
Follow all precautions when installing a device.
General precautions
DANGER
All fiber-optic interfaces use Class 1 lasers.
General requirements